Oriel Window


Oriel Windows for Homes, Builders & Architects in Brighton, Sussex & London
Looking for an oriel window that adds light, space and character to a project? At DLG Systems (Daylight Glazing Systems), we design, manufacture and install bespoke oriel windows for homeowners, builders and architects across Brighton, Sussex and London. Whether you want a sleek, contemporary oriel window for a new extension or a traditional design for a period property, we manage the whole process in-house, from technical drawings to final fit.
What is an oriel window?
An Oriel window is a form of bay window that protrudes from the main wall of a building without reaching the ground, appearing to float. Oriel windows began in medieval and Tudor architecture. Modern versions use large glazed panels and slim aluminium frames, bringing daylight, depth and a sense of extra space into a room without a full extension.
​
​
Benefits of an oriel window
-
More natural light: the projecting design lets daylight in from several angles.
-
Better views: glazing on multiple sides gives a wider outlook of the outdoors.
-
Extra space: an open, airy feel, extra area in the room and the perfect spot for an oriel window seat.
-
Architectural impact: a well-proportioned oriel becomes the focal point of the façade.
-
Thermal efficiency: thermally broken frames and modern glazing help keep heat in, with U-values as low as 1.1 W/m²K.
​
Oriel window vs bay window: what's the difference?
Both project from the building, but they are supported differently.
​

Customers usually choose an oriel for the open, spacious feel, the window seat, the extra area in the room and the better outlook. Many convert an existing window into an oriel.
We inspect the existing structure and design a frame suited to your wall, so get in touch with our technical team and we'll advise on suitability.
Modern Vs Traditional Designs

Every DLG oriel window is made to measure. Our oriels use aluminium frames in anthracite grey as standard, with other colours available on request.
For a sleek, frameless look, glass-to-glass joints can be siliconed for clean lines and uninterrupted views, while a more traditional design can be proportioned to respect a heritage building.
​
Most opening options are possible, such as a side or top fan, but the right choice depends on the projection and the look you want, and opening sections can compromise the sleek frameless finish.
If no other windows serve the room, hidden trickle vents can provide the ventilation Building Regulations require.
Oriel window specification for architects and specifiers
An oriel is a structural element as well as a window, so early coordination saves time and cost. Key points to settle at design stage:
​
-
Structure: the structure must allow for the weight of the glazing, wind loading and movement. Haven't involved a structural engineer yet? Get in touch and we'll help you take the right next step.
-
Base construction: our in-house designer designs the steel or timber base to suit your opening, the product and our survey findings.
-
Oriel glass: choose from solar control coating, easy-clean coating, laminated glass for added security, toughened glass for durability, or clear glass with no tint for the most natural outdoor view.
-
Thermal performance: thermally broken frames, double or triple glazing and adjustable glass specification. U-values can be as low as 1.1 W/m²K, and are available on request.
-
Building Regulations: Parts A (structure), B (fire), K (protection from falling), L (energy efficiency) and M (access) may apply. We make sure our products and installation comply.
-
Construction details: we prepare CAD drawings for your oriel window, helping architects and builders coordinate openings, structure and finishes.
Working with builders and contractors

Our approach keeps the programme running smoothly, with around 6 to 8 weeks from design to completed installation.
​
-
Early survey: accurate site measurements, because small errors show on minimal-sightline glazing.
-
Design and coordination: structural openings by the builder, steelwork and glazing resolved before manufacture, with the design approved by the client first.
-
Manufacture: made off-site to verified dimensions.
-
Installation: fitted in sequence with brickwork, cladding and internal finishes.
-
Handover and aftercare: weathering details completed and covered by our 10-year warranty.
Planning permission for oriel windows
Whether an oriel window needs planning permission depends on the property, how far the window projects, overlooking of neighbours and whether the building is in a conservation area or listed. Building Regulations approval is a separate requirement.
​
Rules vary between local authorities, so it is always worth checking early with your architect.
​
We don't submit planning applications ourselves, but we're happy to help with drawings and liaison with building control. If you're unsure of the next step, ask us and we'll advise.

Why Choose DLG Systems
Specialist oriel window fabricator: bespoke design tailored to your property or scheme.
End-to-end service: design, manufacture and installation handled in-house.
10-year warranty: peace of mind on products and workmanship.
Local expertise: Brighton-based, with projects across Sussex and London. See our projects.
After-sales care: dedicated support long after installation.

Oriel Window FAQS
How much does an oriel window cost?
A typical 1500 x 1800mm oriel window costs from around £4,500 + VAT. The final price depends on the opening type, base detail, size, glass specification and your location.
​
Do oriel windows need planning permission?
It depends on the property, projection and location. Permission is more likely in conservation areas or on listed buildings. We don't submit planning applications, but we can help with drawings and building control, so get in touch and we'll advise on next steps.
​
Can an oriel window be added to an existing building?
Yes. Many customers convert an existing window into an oriel. We inspect the existing structure and design a frame suitable for your wall, and our technical team can advise on suitability.
Can an oriel window open?
Most opening options are possible, such as a side or top fan, depending on the projection and the look you want. Opening sections can compromise the sleek frameless finish, so we'll advise on the best balance.
​
Are oriel windows energy efficient?
They can be as efficient as most other glazing products. Performance depends on the glass specification, such as double or triple glazing, and our thermally broken frames are designed to achieve a better U-value than Building Regulations require.
​
How long does an oriel window take to install?
Around 6 to 8 weeks from design to completed installation.
​
What do you need to provide a quote?
Drawings (if available), dimensions, floor level, location, any other specifications you're looking for and photos. For a more accurate quote, we often schedule a visit.​
​
​
